We provide complete support for qualification and validation of facility, equipments, utilities like water system, AHU’s compressed air and nitrogen (if necessary).
This includes preparation execution of the following:
- URS (user requirement specification) through Risk Assessment
- Design qualification and design reviews
- Factory acceptance tests ( would be done at the equipment manufacturer’s premises)
- SAT (Site Acceptance Test) / Commissioning
- Installation qualification
- Operation qualification
- Performance qualification
Commissioning Support:
Upon installation of equipments, we provide commissioning support by our team during this stage.
Designing of New Facilities:
- Feasibility Studies & Master Planning
- Conceptual Design Studies
- Basic Engineering
- Detailed Engineering
- Project Management
- Procurement Assistance
- Construction Management
- Commissioning Support
- Qualification and Validation
- Automation requirements and software validation